Map of the ATC2 area for ECWE

Journée portes ouvertes sur le prolongement vers l’ouest de la ligne de métro Eglinton Crosstown ─ 2 novembre 2022

Sep 28, 2021
6:30 pm - 8:00 pm (ET)

Overview

On September 28, 2021, Metrolinx hosted a virtual open house for the Eglinton Crosstown West Extension.

Topics covered included:

  • the tunnel connection to Mount Dennis Station;
  • access to local parks and Mount Dennis Station during construction.

Archived stream from the September 28, 2021 virtual open house