Ontario Line
A new 15.6-km subway line in Toronto that will run from Exhibition Place, through downtown, all the way to the Eglinton Crosstown LRT at Don Mills Road.- Don Valley Crossings
Don Valley Crossings
The Ontario Line will emerge from the ground at the eastern embankment of the Don Valley using a tunnel portal structure at Minton Place, south of the Leaside Bridge.
The line will then travel over the valley on the Don Valley Crossing bridge, connecting to an elevated guideway through Thorncliffe Park.
A second West Don Crossing bridge will carry the Ontario Line across the valley, over the E.T. Seton Park area, connecting the Thorncliffe Park and Flemingdon Park guideways and stations.
Portal area map
Renderings
Related Projects
Land Acknowledgement
Metrolinx acknowledges that it operates on lands that have been, and continue to be, home to many Indigenous Peoples including the Anishnabeg, the Haudenosaunee and the Huron-Wendat peoples. We are all Treaty people. Many of us have come here as settlers, as immigrants or involuntarily as part of the trans-Atlantic slave trade, in this generation, or generations past. We acknowledge the historic and continued impacts of colonization and the need to work towards meaningful reconciliation with the original caretakers of this land. We acknowledge that Metrolinx operates on territories and lands covered by many treaties that affirm and value the rights of Indigenous communities, Nations and Peoples. We understand the importance of working towards reconciliation with the original caretakers of this land. At Metrolinx, we will conduct business in a manner that is built on a foundation of trust, respect and collaboration.