Update on Finch West Station and Humber College Station

Images: Crews dig into Finch West and Humber College Stations

There’s action on the Finch West LRT – from the dirt to the second storey of vehicle headquarters.

Dec 14, 2021

Those in charge of capturing the latest images of Toronto’s Finch West light rail transit (LRT) project, have just delivered a virtual holiday gift basket of impressive new photos.

There’s more than one angle captured, though construction updates of Finch West Station and Humber College Station – especially one remarkable bit of art involving a welder – caught our eye.

Also, take a look at the inside of the future control room on the second floor of the Maintenance and Storage Facility (MSF), located at 50 York Gate Blvd., in Toronto. It looks like many offices, perhaps like one you work in if you’ve returned to the workplace, but it’s a reminder that not all the big progress takes place in the dirt and on the tracks. That soon enough, the office space will help control the home of Finch West light rail vehicles, as they are worked on and even cleaned inside the 9,693 m2 space.

Want to know more about the Finch West LRT Project? Just go here.

So scroll down to take a quick tour of what else had been going on, along the new line.

Update on Finch West Station and Humber College Station

Eastern view of crews excavating to the concourse level at Finch West Station. (Metrolinx photo)

the street, shot from high overhead.

Southeast aerial view of Finch West Station, pedestrian portal. (Metrolinx photo)

Image looks down on the street and community.

Eastern ariel view of Finch West Station portal from Romfield Lane to Keele St. (Metrolinx photo)

The building is seen from above.

Northeast ariel view of the new Maintenance and Storage Facility. (Metrolinx photo)

the power lines.

Newly erected OCS poles and pantographs at the Maintenance and Storage Facility. (Metrolinx photo)

an office.

The future control room on the second floor of the Maintenance and Storage Facility. (Metrolinx photo)

an LRV inside the building.

A light rail vehicle at the Maintenance and Storage and Facility. (Metrolinx photo)

Update on Finch West Station and Humber College Station

Crews working on burn-in section on York Gate Blvd. (Metrolinx photo)

a road.

West view of the guideway from Sentinel Rd. (Metrolinx photo)

tractors working.

Crews excavating at the Humber College Station stop. (Metrolinx photo)

a man welding.

A Mosaic worker welding at the Humber College Station stop. (Metrolinx photo)

a concrete cavern.

Breakthrough view of Humber College Portal to Humber College Station stop. (Metrolinx photo)

metal ready for a concrete pour.

The Humber College Portal at Highway 27. (Metrolinx photo)

a portal.

West view of Finch Avenue West portal is now track ready. (Metrolinx photo)

Update on Finch West Station and Humber College Station

Base asphalt is laid on York Gate Blvd. (Metrolinx photo)

concrete being poured.

Concrete being poured for a track slab on Finch Ave. W. between Jane St. and Keele St. (Metrolinx photo)